Decoloration
DECOLORATION
Due to the increasing environmental sensitivity and the obligations stipulated by the current legislation, most of the industrial plants that consume water have established their wastewater treatment plants. Pursuant to Article 3 of the “WATER POLLUTION REGULATION” published in 2012, a “Color Parameter” requirement is imposed for the industries subject to the specified tables.
Direct discharge of colored wastewater into the receipt environment affects the photosynthetic activities adversely depending on a decrease in light transmittance in the relevant water body, and decreases the dissolved oxygen concentration in the environment over time. At the same time, due to the toxic effects of the dyestuffs and their by-products on nature and their mutagenic and carcinogenic effects on humans, they must be treated. Therefore, it is inevitable that the color parameter is accepted as pollutant parameter as well as the pollutant parameters such as dissolved organic solids (DOC), suspended solids (SS).
Industries, Which Most Commonly Encountered with Wastewater Color Problems:
• Textile Industry• Leather Industry
• Food and Beverage Industry
• Paper Industry
• Chemistry and Petro-chemistry
To reduce the color parameter in Waste Water to the discharge limits according to the regulation, Liberta Kimya helps you to comply with the environmental regulations and reduce your costs for its products.
WASTEWATER TREATMENT SERVICES
Contact Liberta Kimya for your wastewater requirements. We can provide expert advice and support on maintenance, management and treatment of the commercial and industrial boilers and steam generation systems to help you to optimize the costs and operational efficiencies, reduce the downtime, save water and energy, maintain the steam quality and increase plant reliability. We apply the following processes by taking samples from your wastewater in your plants:
• Sample Jar tests (completed within 5 working days)• Laboratory Reporting (completed no later within 2 working days after the Jar test results)
• Site Jar Testing (the Jar Test work that we will do together again in the facility with our product/products determined in the survey)
• Site Reporting (completed no later within 2 working days after the on-site Jar test results)
• A Quotation (based on annual consumption amounts and contract conditions)
• Site tests (the site tests with chemicals with their results obtained)